134 Park Avenue, Palo Alto |
||
|
At 134 Park Ave, the existing
3 bedroom/2 bath home is being remodeled
into a 4,200 sq.ft, 5 bedroom w/ basement, 5 bath, custom home. The images
below show the home being raised and supported while the basement was
dug and poured. Work contnues on the 2nd story addition
|
|
Digging
the basement under the existing home...
|
![]() |
![]() |
|||
![]() |
![]() |
|||
![]() |
![]() |
|||
|
Laying
the basement foundation
|
![]() |
![]() |
|||
![]() |
![]() |
|||
![]() |
![]() |
|||
![]() |
||||
|
Work begins
on the ground floor and second story addition
|
![]() |
![]() |
|||
![]() |
![]() |
|||
![]() |
![]() |
![]() |
||||
|
Roof and
trim are prepared for shingling
|
![]() |
![]() |
|||
![]() |
![]() |
|||
![]() |
![]() |
![]() |
![]() |
![]() |
||||
![]() |
![]() |
|||
|
Roof is
shingled and house is prepared for stucco
|
![]() |
![]() |
![]() |
![]() |
![]() |
||||
|
Interior
is "taped and textured."
|
![]() |
![]() |
![]() |
||||
|
Stucco
is completed, Exterior & Landscaping is done.
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||||
|
Inside,
the home is furnished and decorated
|
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||||
![]() |
![]() |
![]() |
||||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
|||||
![]() |
![]() |